We recently overseeded our range tees with annual ryegrass for the winter. This gives the members the option to practice and hit shots from actual turf, giving an authentic reaction with their swing, as opposed to hitting off of a mat. We verticut the range tees with a 5 reel unit at -0.250" below the bed-knife. This helped to open the existing turf canopy, so the ryegrass seed could germinate and reach the soil surface. The tee was then mowed clean. The seed was then spread over the top of the existing turf with a Gandy Drop Spreader, set to the widest setting.
The seed was spread at a rate of 12 lbs. of ryegrass seed/1000 sq. ft. We used a heavy rate to ensure a healthy, thick stand that would withstand the traffic and hitting patterns on the tees.
The seed was watered for 5 min every hour to promote germination. It will take approximately a month for the seed stand to grow in fully and be useable for golfers.
Monday, October 9, 2017
Friday, September 29, 2017
Mowing Fairways

Monday, September 18, 2017
Edging Greens


- On the Highlands, to prevent the TifGrand Bermudgrass collars from encroaching in the TifEagle greens and vice versa, they are edged. This keeps the greens and collars the size they were intended to be from the renovation. Also, edging the greens helps the operator see exactly were the edge of the green is when they are mowing their clean-up passes. Edging greens occurs roughly once every three weeks, but really just depends on how vigirously the turfgrass is growing.
Wednesday, September 6, 2017
Aerification
- The interns played huge roles in carrying out both courses aerifications. They operated aerifiers, top-dressers, gradens, and verticutters. Riverside's aerification went from July 4-10 and Highlands was July 17-21. The guys logged some long hours and had great attitudes through the whole process.



Below: One of the interns is operating a graden on the Riverside greens, this machine removes thatch to improve the turfgrass' ability to breathe, absorb nutrients, water, and sunlight.
Monday, September 4, 2017
Bunker Maintenance
-We are fortunate at Atlanta Athletic Club that the club is closed on Mondays. This allows us to do jobs that we are not able to complete in as timely of a manner Tuesday-Friday, when the club is open. Mowing bunker faces is one the tasks we complete every Monday. We use flymo mowers are used complete task, these are mowers that do not have wheels and move by creating a cushion of air between the mower and the ground allowing the mower to hover. This allows the mower to move in any direction and mow steep banks without scalping.

- The bunker are edged every other week to two weeks depending on how fast the grass is growing. This process begins after the flymo mowers have mowed. First, the sand is pulled off the faces of the bunker to allow for a sharp clean cut. Then, a weedeater is used to put that clean edge of the bunker. The last part of the process is to blow the grass clipping out of the bunker, push the sand back up on the bunker faces, and rake the bunker.
- The interns take on the responsibility of making sure all bunkers are mowed, raked, and that the crew is completing the process in a timely fashion. This allows our interns to find out what it is like to run a crew and the importance of detail.


- The interns take on the responsibility of making sure all bunkers are mowed, raked, and that the crew is completing the process in a timely fashion. This allows our interns to find out what it is like to run a crew and the importance of detail.
Fertilizing
Saturday, August 19, 2017
Course Set Up
- One of the morning assignments our interns take on is "course set-up". This consists of selecting pin positions, setting tee markers to coincide with the pin position, blowing off tees, greens, cart paths and making sure the course is prepared for the day's play.
Subscribe to:
Posts (Atom)





